Installation and maintenance of Refractory Lining in Boiler 100 MW Unit 3 and Boiler 100 MW Unit 4 at PLTU Tarahan, Jl. Lintas Timur Sumatra No.Km. 15, Rangai Tri Tunggal, Kec. Katibung, South Lampung Regency
PThe Refractory Lining Re-Install Project is carried out periodically over a period of time, as below: